Day 70 of the build:



Yesterday we went out for an extended tour. The most noticeable improvement was in plumbing. Shower heads and fixtures installed, toilets are in, the powder room is nearly complete, and in the basement the water heater is attached. It was good to hear water running as the plumbers tested their connections.

The a/c compressor has been installed on its shelf behind the garage.

Today the electricians were in with all of the lighting fixtures. The outside carriage lamps were assembled in the garage, 'chic let' light in the kitchen, and 'can' lights placed near their locations for installation.

...and the front door has been painted a very pretty brick red.